• Because of the battery shunt trip wiring route in the 93PM UPS cabinet, the wiring from the IBC to the UPS must use wire rated for 600V and Class 1 wiring methods. Page 28 Carefully inspect the outer packaging for evidence of damage during transit.
ing between the UPS and battery cabinet is to be provided by the customer.When installing external interface wiring (for example, battery breaker shunt trip) to the battery cabinet interface terminals, conduit must be installed between the battery cabinets and the UPS cabi
How do I install a battery cabinet?
tween each battery cabinet and the UPS or battery disconnect using conduit. Batt ry cabinets may be installed adjacent to the UPS or in a separate location.If the battery cabinet is installed adjacent to the UPS, the recommended installati n location for the battery cabinet is on the right side of the UPS cabi
How do I install the 9395 model IBC-L Battery Cabinet?
serve a preferred startup date.1.1 Configuration and installation featuresThe 9395 Model IBC-L battery cabinet is designed to e installed in a standalone configuration using up tp two battery cabinets. Power wiring is installed externally b tween each battery cabinet and the UPS or battery disconnect using conduit. Batt
What is a battery cabinet (IBC) system?
Battery Cabinet (IBC) systems are housed in single free-standing cabinets. Model IBC-L with a ingle battery voltage range is available to meet application runtime nee s. Up to four cabinets may be installed to further ext nd battery runtimes. The cabinets match the UPS cabinet in style
Where is the battery cabinet located?
n location for the battery cabinet is on the right side of the UPS cabi et. This location will allow for future expansion using an external module.Cabine s can be permanently bolted to the floor or left standing on leveling feet.Power and control wiring can be routed throu h the top or bottom of the cabinet depending on inst
600V. The wiring should be a minimum of 18 AWG rated at 48V, 1 A minimum.All interface w ing between the UPS and battery cabinet is to be provided by the customer.When installing external interface wiring (for example, battery breaker shunt trip) to the battery cabinet interface terminals,