Should you mount solar panels on a wall or a sloping roof, they cannot stick out more than 200 millimetres from the surface of that wall or roof. Since the 2016 edition of NFPA 1, access pathways have been required on roofs to facilitate fire service access as well as egress. design assessment must be completed for the suitability of the proposed panels and the nature of the roof they are to be mounted on e., slope, construction material. Consideration should also be given to: The maximum fuse rating of the array. This document does not address solar towers, roof-mounted solar-powered water heaters, PV. If panels are isolated or have reached the end of their life, even if electrically disconnected, if they are still located on the roof directed to the sky, they create similar exposures to an operational array. The photovoltaic (PV) elements in the panels will still be generating direct current. This involves a detailed structural load analysis for PV roofs, accounting for various forces. Several types of loads act on a roof after a PV installation. -Zapfe GmbH, Engineering Office for Construction Engineering and Solar Plan-ning Phone: +49(0)8072 9191280; Fax: +49(0)8072 91919280 E-Mail: cedrik.